Index of ftp://ftp.3gpp.org/tsg_ran/WG1_RL1/TSGR1_101-e/Inbox/drafts

[DIR] Parent Directory

-15 -14 -13 -12 -11 -10 -09 -08 -07 -06 -05 -04 -03 -02 -01   page 02 of 06
+01 +02 +03 +04 +05 +06 +07 +08 +09 +10 +11 +12 +13 +14 +15   <- Back | Next page ->

[DIR] 6.2.4 Maintenance of LTE-based 5G Terrestrial Broadcast  0.00b  June 19 2020 at 04:47
[DIR] 6.2.4.1 New numerology(ies) for PMCH for support of rooftop reception  0.00b  May 18 2020 at 07:04
[DIR] 6.2.4.2 Necessity and detailed enhancements to the physical channels and signals in the CAS  0.00b  May 18 2020 at 07:04
[DIR] 6.2.4.3 New numerology for support of mobility of up to 250kmh  0.00b  May 18 2020 at 07:04
[DIR] 6.2.4.4 Other  0.00b  May 18 2020 at 07:04
[DIR] 6.2.5 LTE Rel-16 UE Features  0.00b  June 12 2020 at 04:16
[DIR] 6.2.5.1 UE features for additional MTC enhancements  0.00b  May 25 2020 at 05:32
[DIR] 6.2.5.2 UE features for additional enhancements for NB-IoT  0.00b  May 25 2020 at 05:37
[DIR] 6.2.5.3 UE features for DL MIMO efficiency enhancements for LTE  0.00b  May 25 2020 at 00:31
[DIR] 6.2.5.4 UE features for LTE-based 5G terrestrial broadcast  0.00b  May 18 2020 at 07:04
[DIR] 6.2.5.5 Other  0.00b  June 8 2020 at 03:13
[DIR] 6.2.6 Other  0.00b  May 18 2020 at 07:04
[DIR] 7 NR Maintenance  0.00b  May 18 2020 at 07:04
[DIR] 7.1 Maintenance of Release 15 NR  0.00b  May 27 2020 at 06:43
[DIR] 7.1.1 Maintenance for Initial access and mobility  0.00b  May 18 2020 at 07:04
[DIR] 7.1.2 Maintenance for MIMO  0.00b  May 18 2020 at 07:04
[DIR] 7.1.3 Maintenance for Scheduling-HARQ aspects  0.00b  May 25 2020 at 02:48
[DIR] 7.1.4 Maintenance for NR-LTE co-existence  0.00b  May 18 2020 at 07:04
[DIR] 7.1.5 Maintenance for UL power control  0.00b  May 18 2020 at 07:04
[DIR] 7.1.6 Other  0.00b  May 18 2020 at 07:04
[DIR] 7.2 Maintenance of Release 16 NR  0.00b  June 12 2020 at 08:50
[DIR] 7.2.1 Maintenance of Two step RACH for NR  0.00b  June 22 2020 at 12:52
[DIR] 7.2.1.1 Channel Structure for Two-Step RACH  0.00b  May 22 2020 at 02:46
[DIR] 7.2.1.2 Procedure for Two-step RACH  0.00b  May 21 2020 at 07:33
[DIR] 7.2.1.3 Other  0.00b  May 18 2020 at 07:04
[DIR] 7.2.10  0.00b  May 18 2020 at 07:04
[DIR] 7.2.10.1 Uplink Power Control for Supporting NR-NR Dual-Connectivity  0.00b  June 6 2020 at 01:43
[DIR] 7.2.10.2 Potential Enhancements to Single Tx Switched Uplink Solution for EN-DC  0.00b  June 4 2020 at 04:54
[DIR] 7.2.10.3  0.00b  June 5 2020 at 17:58
[DIR] 7.2.10.4  0.00b  June 5 2020 at 13:09

-15 -14 -13 -12 -11 -10 -09 -08 -07 -06 -05 -04 -03 -02 -01   page 02 of 06
+01 +02 +03 +04 +05 +06 +07 +08 +09 +10 +11 +12 +13 +14 +15   <- Back | Next page ->